This project is located in Sarasota County’s Lakewood Ranch Development, providing a new fire station to the east of I-75, within 1.5 miles of the rapidly growing community. The project consists of one doublewide bunkhouse, a two-bay metal building, with onsite parking and maintenance area.
DMK has been hired to redevelop three parks in the Charlotte County area; Englewood East Park, Deep Creek Park, and Rotonda Community Park and Preserve. The parks will be redeveloped to better serve the public
Englewood East
The redevelopment of this Park will replace the basketball Court and Playground areas while adding new bike paths, additional walkways, and a water fountain. Community information was requested, gathered, and put into design. Permitting through Charlotte County in progress. Digital rendition of proposed playground below.
Deep Creek Park
Currently in the process of gathering public information. At this time a new basketball court, new soccer field, new covered areas, and additional walkways are planned.
Rotonda Community Park & Preserve
Future gathering of public information will occur. At this time a new pickleball court, new multi-purpose field, new covered areas, expansion of the playground area, and additional walkways are planned.
The GIBA following buildings were water damaged as a result of Hurricane Ian: Administrative, Maintenance, and Bridge House.
DMK is preparing Schematic Design Services, Construction Plans.
On this Park project, DMK was requested by the architectural team to provide all services related to land surveying, site planning, stormwater management, seawall and dock permitting, utility designs and permitting, assistance with FDEP permitting for activities seaward of the Coastal Construction Control Line and general coordination with the Architectural and Planning group charged with obtaining public and local input.
Coastal engineering, design, and permitting by DMK included FDEP ERP permitting for docks, kayak launch, and boardwalks as well as FDEP Coastal Construction Control Line permitting for emergency vehicular access to the beach, pedestrian access ramp, and observation deck.
In developing plans, public involvement was necessary to make sure that the end product is meaningful and useful to the surrounding community. Making Bayfront Park the success that it is.
DMK is proud to have helped complete the family friendly addition to this park. According to the Florida Department of Veteran's Affairs (FDVA), Florida is ranked third for highest veteran population. Charlotte County alone has almost 200,00 among its population. It's a privilege to have been part of project and bring more veteran recognition and appreciation to our community.
DMK completed the planning, site analysis, design, and construction services for the new park entry drive, playground, playground parking, pedestrian walkways and covered pavilion.
In the future we can look forward to a kayak launch and a new interactive/educational memorial.
Design, permitting and construction administration for the new Lemon Bay High School campus including athletic fields, and football field on the existing 45-acre campus. DMK has been providing engineering and surveying for the Lemon Bay High School campus for over 20 years.
DMK has provided design, permitting and construction phase services for the multi-phase project through completion of the final build out of the 3-story classroom wing, cafeteria, gymnasium, music suite and auditorium, administration buildings, medical center, energy plant, bus loop and parking areas which were completed in 2016.
Civil design, permitting and construction administration for new Athletic fields at Lemon Bay High School.The survey portion included aerial control surveys, topographic surveys for drainage run-off and construction layout for drainage and for the ball fields.